Item 2506.601 INFILTRATION/FILTRATION SYSTEM

It appears that this is for the swales in between the check dams where the filter topsoil borrow is installed. My questions is how many tests will be required. Will each area (Approximately 28) be counted as a seperate basin? that would be 28 basins x 2 tests bottom x 2 tests top = 112 tests. Or will each side of the road be counted as a basin which would equal 8 test total, 4 on each side?
  • Johnson, Benjamin T
  • 04/01/2019 8:07 AM

RE: Item 2506.601 INFILTRATION/FILTRATION SYSTEM

Please consider each side (north/south) of the proposed roadway as a separate system. Two tests per layer for each side of the roadway will be required, for a total of 8 tests.