Olmsted County Public Works

Welcome, Guest!
Log in | Employee Login | License
 

Contract Bid Abstract

055-605-016 - CSAH 5 Construction - Phase IIICON Constructors, LLC S.M. Hentges & Son, Inc. Lunda Construction Company 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$364,800.00$364,800.00$369,000.00$369,000.00$483,979.00$483,979.00
2031.502FIELD OFFICE TYPE DEACH1$16,650.00$16,650.00$58,200.00$58,200.00$43,431.98$43,431.98
2101.505CLEARINGACRE6.27$2,700.00$16,929.00$2,500.00$15,675.00$3,000.00$18,810.00
2101.505GRUBBINGACRE6.27$2,700.00$16,929.00$2,000.00$12,540.00$2,500.00$15,675.00
2101.524CLEARINGTREE31$100.00$3,100.00$100.00$3,100.00$200.00$6,200.00
2101.524GRUBBINGTREE31$100.00$3,100.00$155.00$4,805.00$100.00$3,100.00
2104.502REMOVE FOUNDATIONEACH1$2,500.00$2,500.00$1,000.00$1,000.00$2,445.00$2,445.00
2104.502SALVAGE METAL APRONEACH2$50.00$100.00$100.00$200.00$100.00$200.00
2104.502SALVAGE LUMINAIREEACH9$250.00$2,250.00$76.00$684.00$75.00$675.00
2104.502SALVAGE LIGHTING UNITEACH1$500.00$500.00$200.00$200.00$200.00$200.00
2104.502SALVAGE SIGNEACH5$50.00$250.00$51.00$255.00$45.00$225.00
2104.502REMOVE CONCRETE STRUCTUREEACH1$2,000.00$2,000.00$540.00$540.00$1,365.00$1,365.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F20$5.00$100.00$5.00$100.00$2.25$45.00
2104.503SAWING CONCRETE PAVEMENT (FULL DEPTH)L F53$7.00$371.00$6.50$344.50$5.00$265.00
2104.503REMOVE DIRECT BURIED LIGHTING CABLEL F178$3.00$534.00$2.00$356.00$5.00$890.00
2104.503SALVAGE PIPE CULVERTL F26$10.00$260.00$12.03$312.78$12.00$312.00
2104.503REMOVE CURB & GUTTERL F266$7.00$1,862.00$5.00$1,330.00$4.00$1,064.00
2104.503REMOVE FENCEL F190$3.00$570.00$7.00$1,330.00$4.00$760.00
2104.504REMOVE CONCRETE WALKS Y25$5.00$125.00$6.00$150.00$13.00$325.00
2104.504REMOVE BITUMINOUS PAVEMENTS Y10$5.00$50.00$10.00$100.00$8.00$80.00
2105.601ACCESS FACILITYLS1$235,000.00$235,000.00$61,336.63$61,336.63$600,000.00$600,000.00
2106.507EXCAVATION - COMMON (P)C Y66,594$4.65$309,662.10$2.22$147,838.68$3.68$245,065.92
2106.507EXCAVATION - ROCK (P)C Y48,772$8.15$397,491.80$10.75$524,299.00$5.50$268,246.00
2106.507SELECT GRANULAR EMBANKMENT (CV) (P)C Y10,231$12.50$127,887.50$10.50$107,425.50$16.00$163,696.00
2106.507COMMON EMBANKMENT (CV) (P)C Y90,055$1.35$121,574.25$1.50$135,082.50$3.18$286,374.90
2106.507SELECT GRANULAR EMBANKMENT MOD 10% (CV) (P)C Y1,766$12.50$22,075.00$20.00$35,320.00$22.00$38,852.00
2118.509AGGREGATE SURFACING CLASS 2TON35$20.00$700.00$40.00$1,400.00$21.00$735.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR50$100.00$5,000.00$160.00$8,000.00$150.00$7,500.00
2211.509AGGREGATE BASE CLASS 5 MODTON10,825$16.00$173,200.00$6.50$70,362.50$13.50$146,137.50
2301.502DOWEL BAREACH7,254$8.27$59,990.58$10.00$72,540.00$8.27$59,990.58
2301.504CONCRETE PAVEMENT 8.0"S Y14,871$42.76$635,883.96$54.00$803,034.00$42.76$635,883.96
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON2,387$69.00$164,703.00$70.00$167,090.00$69.00$164,703.00
2401.503TYPE MOD P-1 BARRIER CONC (3S52) (P)L F529$75.50$39,939.50$134.00$70,886.00$75.50$39,939.50
2401.503TYPE S (TL-4) 36" BARRIER CONC (3S52) (P)L F537$72.00$38,664.00$90.00$48,330.00$72.00$38,664.00
2401.503TYPE S (TL-4) 42" BARRIER CONC (3S52) (P)L F576$78.75$45,360.00$133.00$76,608.00$78.75$45,360.00
2401.507STRUCTURAL CONCRETE (1X62) (P)C Y1,049$350.00$367,150.00$210.00$220,290.00$250.00$262,250.00
2401.507STRUCTURAL CONCRETE (1G52) (P)C Y599$525.00$314,475.00$425.00$254,575.00$750.00$449,250.00
2401.507STRUCTURAL CONCRETE (3B52) (P)C Y949$750.00$711,750.00$845.00$801,905.00$900.00$854,100.00
2401.508REINFORCEMENT BARS (P)LB47,780$1.20$57,336.00$1.16$55,424.80$1.25$59,725.00
2401.508REINFORCEMENT BARS (EPOXY COATED) (P)LB392,390$1.20$470,868.00$1.26$494,411.40$1.65$647,443.50
2401.518SIDEWALK CONCRETE (3S52) (P)S F6,134$14.00$85,876.00$9.25$56,739.50$9.83$60,297.22
2401.601STRUCTURE EXCAVATIONLS1$60,000.00$60,000.00$200,000.00$200,000.00$75,000.00$75,000.00
2401.601FOUNDATION PREPARATION PIER 1LS1$186,700.00$186,700.00$204,100.00$204,100.00$300,000.00$300,000.00
2401.601FOUNDATION PREPARATION PIER 2LS1$186,700.00$186,700.00$204,100.00$204,100.00$300,000.00$300,000.00
2401.601FOUNDATION PREPARATION PIER 3LS1$186,700.00$186,700.00$204,100.00$204,100.00$325,000.00$325,000.00
2401.618BRIDGE DECK PLANING (P)S F22,520$1.35$30,402.00$1.35$30,402.00$1.35$30,402.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)S F28,325$21.00$594,825.00$32.00$906,400.00$30.00$849,750.00
2402.502BEARING ASSEMBLYEACH52$900.00$46,800.00$761.00$39,572.00$700.00$36,400.00
2402.503ORNAMENTAL METAL RAILING (P)L F529$140.00$74,060.00$127.00$67,183.00$120.00$63,480.00
2402.503EXPANSION JOINT DEVICES TYPE 4 (P)L F139$180.00$25,020.00$173.00$24,047.00$100.00$13,900.00
2405.503PRESTRESSED CONCRETE BEAMS MN63 (P)L F3,121$300.00$936,300.00$233.00$727,193.00$250.00$780,250.00
2405.503DIAPHRAGMS FOR TYPE MN63 PREST BEAMS (P)L F741$120.00$88,920.00$119.00$88,179.00$80.00$59,280.00
2406.503EXPANSION JOINTS; DESIGN E8H (P)L F92$100.00$9,200.00$84.50$7,774.00$85.00$7,820.00
2406.504BRIDGE APPROACH PANELS (P)S Y507$235.00$119,145.00$225.00$114,075.00$200.00$101,400.00
2412.5026X4 PRECAST CONCRETE BOX CULV END SECTEACH4$8,700.00$34,800.00$6,800.00$27,200.00$6,500.00$26,000.00
2412.5036X4 PRECAST CONCRETE BOX CULVERTL F304$650.00$197,600.00$530.00$161,120.00$600.00$182,400.00
2451.507GRANULAR BEDDINGC Y176.4$25.00$4,410.00$33.00$5,821.20$18.00$3,175.20
2451.507GRANULAR BEDDINGC Y0.6$25.00$15.00$30.00$18.00$25.00$15.00
2452.502STEEL H-TEST PILE 35 FT LONG 12"EACH4$8,000.00$32,000.00$5,000.00$20,000.00$2,500.00$10,000.00
2452.502STEEL H-TEST PILE 40 FT LONG 12"EACH2$8,000.00$16,000.00$5,500.00$11,000.00$2,500.00$5,000.00
2452.502STEEL H-TEST PILE 45 FT LONG 12"EACH2$8,000.00$16,000.00$6,000.00$12,000.00$3,000.00$6,000.00
2452.502STEEL H-TEST PILE 60 FT LONG 12"EACH2$9,000.00$18,000.00$7,500.00$15,000.00$3,500.00$7,000.00
2452.502PILE REDRIVINGEACH74$1.00$74.00$250.00$18,500.00$175.00$12,950.00
2452.502PILE TIP PROTECTION 12"EACH103$300.00$30,900.00$100.00$10,300.00$100.00$10,300.00
2452.503STEEL H-PILING DELIVERED 12"L F2,368$42.00$99,456.00$27.75$65,712.00$27.00$63,936.00
2452.602ROCK SOCKETEACH74$1.00$74.00$500.00$37,000.00$1,295.00$95,830.00
2452.602PILE PLACEMENTEACH74$1.00$74.00$802.56$59,389.44$750.00$55,500.00
2452.603PREBORING (EARTH)L F1,110$0.01$11.10$88.00$97,680.00$97.75$108,502.50
2452.603STEEL H-PILING 12"L F3,390$42.00$142,380.00$86.65$293,743.50$40.00$135,600.00
2501.50215" RC PIPE APRONEACH2$725.00$1,450.00$1,088.00$2,176.00$625.00$1,250.00
2501.50218" GS PIPE APRONEACH6$125.00$750.00$520.00$3,120.00$175.00$1,050.00
2501.50224" GS PIPE APRONEACH2$150.00$300.00$540.00$1,080.00$200.00$400.00
2501.502INSTALL METAL APRONEACH2$50.00$100.00$450.00$900.00$150.00$300.00
2501.50318" CS PIPE CULVERTL F119$31.00$3,689.00$46.00$5,474.00$34.00$4,046.00
2501.50324" CS PIPE CULVERTL F98$39.00$3,822.00$48.00$4,704.00$44.00$4,312.00
2501.503INSTALL PIPE CULVERTL F26$15.00$390.00$34.00$884.00$20.00$520.00
2502.501DRAINAGE SYSTEM TYPE (B910)LS1$5,000.00$5,000.00$3,800.00$3,800.00$5,000.00$5,000.00
2503.50315" RC PIPE SEWERL F168$50.00$8,400.00$56.00$9,408.00$55.00$9,240.00
2506.502CONST DRAINAGE STRUCTURE DESIGN NEACH6$850.00$5,100.00$2,200.00$13,200.00$2,345.00$14,070.00
2506.601INFILTRATION/FILTRATION SYSTEMLS1$18,375.00$18,375.00$6,800.00$6,800.00$8,375.00$8,375.00
2506.802CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4024EACH3$2,100.00$6,300.00$2,900.00$8,700.00$2,845.00$8,535.00
2511.504GEOTEXTILE FILTER TYPE 7S Y2,340$3.00$7,020.00$3.50$8,190.00$4.25$9,945.00
2511.507RANDOM RIPRAP CLASS IIIC Y2,184.4$40.00$87,376.00$43.00$93,929.20$80.00$174,752.00
2511.507RANDOM RIPRAP CLASS IIIC Y1,115$40.00$44,600.00$60.00$66,900.00$80.00$89,200.00
2511.507RANDOM RIPRAP CLASS IIIC Y9.6$40.00$384.00$43.00$412.80$80.00$768.00
2521.5184" CONCRETE WALKS F3,730$4.70$17,531.00$5.00$18,650.00$4.70$17,531.00
2531.503CONCRETE CURB & GUTTER DESIGN B424L F221$28.00$6,188.00$26.00$5,746.00$28.00$6,188.00
2531.503CONCRETE CURB & GUTTER DESIGN B624L F1,541$19.00$29,279.00$24.00$36,984.00$19.00$29,279.00
2531.504CONCRETE MEDIANS Y18$34.85$627.30$116.00$2,088.00$34.85$627.30
2531.618TRUNCATED DOMESS F112$45.00$5,040.00$49.00$5,488.00$45.00$5,040.00
2545.501CONDUIT SYSTEM (FUTURE)LS1$54,000.00$54,000.00$43,100.00$43,100.00$43,050.00$43,050.00
2545.502LIGHTING UNIT TYPE 9-40EACH2$4,000.00$8,000.00$2,700.00$5,400.00$2,650.00$5,300.00
2545.502LUMINAIRE (LED) 40 FOOTEACH10$625.00$6,250.00$328.00$3,280.00$325.00$3,250.00
2545.502LIGHT FOUNDATION DESIGN EEACH2$625.00$1,250.00$930.00$1,860.00$925.00$1,850.00
2545.5033" NON-METALLIC CONDUITL F102$5.85$596.70$15.25$1,555.50$15.00$1,530.00
2545.503DIRECT BURIED LIGHTING CABLE 4/C 4 AWGL F545$23.50$12,807.50$7.00$3,815.00$7.00$3,815.00
2545.602INSTALL LIGHTING UNITEACH1$950.00$950.00$305.00$305.00$300.00$300.00
2554.502END TREATMENT-TANGENT TERMINALEACH1$2,775.00$2,775.00$2,800.00$2,800.00$2,775.00$2,775.00
2554.503TRAFFIC BARRIER DESIGN TYPE 31L F112.5$33.00$3,712.50$33.50$3,768.75$33.00$3,712.50
2554.503TRAFFIC BARRIER DESIGN TRANS TYPE 31L F75$105.50$7,912.50$106.00$7,950.00$105.50$7,912.50
2554.615IMPACT ATTENUATORAMBY2$5,375.00$10,750.00$5,400.00$10,800.00$5,375.00$10,750.00
2563.601TRAFFIC CONTROLLS1$6,500.00$6,500.00$12,000.00$12,000.00$4,900.00$4,900.00
2564.502SIGN SUPPORT CANTILEVEREACH1$2,200.00$2,200.00$2,210.00$2,210.00$2,200.00$2,200.00
2564.502OBJECT MARKER TYPE X4-2EACH1$250.00$250.00$252.00$252.00$50.00$50.00
2564.502OBJECT MARKER TYPE X4-5EACH3$125.00$375.00$126.00$378.00$50.00$150.00
2564.518SIGN PANELS TYPE CS F126.2$51.00$6,436.20$52.00$6,562.40$55.00$6,941.00
2564.518SIGN PANELS TYPE DS F168$31.50$5,292.00$32.00$5,376.00$49.00$8,232.00
2564.602INSTALL SIGNEACH1$125.00$125.00$126.00$126.00$100.00$100.00
2573.501STABILIZED CONSTRUCTION EXITLS2$500.00$1,000.00$1,100.00$2,200.00$1,500.00$3,000.00
2573.502STORM DRAIN INLET PROTECTIONEACH9$125.00$1,125.00$200.00$1,800.00$110.00$990.00
2573.502CULVERT END CONTROLSEACH6$100.00$600.00$200.00$1,200.00$125.00$750.00
2573.503SILT FENCE; TYPE MSL F10,805$1.60$17,288.00$1.94$20,961.70$1.70$18,368.50
2573.503FLOTATION SILT CURTAIN TYPE STILL WATERL F541$11.00$5,951.00$8.10$4,382.10$12.00$6,492.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERL F592$16.50$9,768.00$15.25$9,028.00$18.12$10,727.04
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERL F105$3.00$315.00$3.00$315.00$3.25$341.25
2573.503SEDIMENT CONTROL LOG TYPE BLANKET SYSTEML F1,125$3.00$3,375.00$4.00$4,500.00$3.25$3,656.25
2574.507COMMON TOPSOIL BORROWC Y1,000$1.00$1,000.00$25.00$25,000.00$1.00$1,000.00
2574.507FILTER TOPSOIL BORROWC Y1,560$25.00$39,000.00$39.00$60,840.00$38.00$59,280.00
2574.508FERTILIZER TYPE 3LB5,463$0.50$2,731.50$0.50$2,731.50$0.55$3,004.65
2575.504EROSION CONTROL BLANKETS CATEGORY 3NS Y46,405$1.20$55,686.00$1.28$59,398.40$1.24$57,542.20
2575.504EROSION CONTROL BLANKETS CATEGORY 6NS Y783$2.50$1,957.50$4.10$3,210.30$2.60$2,035.80
2575.505SEEDINGACRE18.31$80.00$1,464.80$302.00$5,529.62$85.00$1,556.35
2575.505DISK ANCHORINGACRE8.3$70.00$581.00$102.00$846.60$65.00$539.50
2575.505MOWINGACRE54.92$80.00$4,393.60$76.00$4,173.92$85.00$4,668.20
2575.508SEED MIXTURE 35-241LB668$15.00$10,020.00$15.00$10,020.00$16.21$10,828.28
2575.509MULCH MATERIAL TYPE 3TON17.44$200.00$3,488.00$226.00$3,941.44$300.00$5,232.00
2575.523WATERMGAL50$30.00$1,500.00$41.00$2,050.00$35.00$1,750.00
2575.523RAPID STABILIZATION METHOD 3MGAL50$200.00$10,000.00$242.00$12,100.00$200.00$10,000.00
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F1,694$0.65$1,101.10$0.66$1,118.04$0.65$1,101.10
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F11,075$0.75$8,306.25$0.76$8,417.00$0.75$8,306.25
2582.50324" SOLID LINE MULTI COMP GR IN (WR)L F41$16.50$676.50$16.75$686.75$16.50$676.50
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F2,600$0.65$1,690.00$0.66$1,716.00$0.65$1,690.00
2582.50312" DOTTED LINE MULTI COMP GR IN (WR)L F102$14.20$1,448.40$14.25$1,453.50$14.20$1,448.40
2582.5034" DBLE SOLID LINE MULTI COMP GR IN (WR)L F1,701$1.30$2,211.30$1.32$2,245.32$1.30$2,211.30
2582.518CROSSWALK MULTI COMP GR IN (WR)S F426$9.50$4,047.00$9.60$4,089.60$9.50$4,047.00
 Totals for project 055-605-016 $8,526,761.44 $8,998,857.37 $10,037,640.63
 
Contract Total:$8,526,761.44$8,998,857.37$10,037,640.63